cGMP Clean Utility Design
Project: 060018 Cold Water for Injection Loop Design
Overall Project Budget: $1,000,000+
General Description of Project: Griffin Engineering and Technical Services, Inc. was contracted by a local pharmaceutical company to design a CWFI loop expansion for the existing CWFI system. The project involved adding 16 users and over 2,000 feet of distribution pipe to the system.
Services Provided:
- User Requirements Specification for the New Points of Use
- Mechanical Design and Layout of New Equipment and Piping
- Construction Specifications - Mechanical and Electrical
- Instrument and Equipment Specifications
- Hydronic Modeling of the System
- Development of the Control Loop Diagrams
- System P&IDs
- Construction Period Support
