cGMP Clean Utility Design

Project: 060018 Cold Water for Injection Loop Design
Overall Project Budget: $1,000,000+

General Description of Project: Griffin Engineering and Technical Services, Inc. was contracted by a local pharmaceutical company to design a CWFI loop expansion for the existing CWFI system. The project involved adding 16 users and over 2,000 feet of distribution pipe to the system.

Services Provided:

  • User Requirements Specification for the New Points of Use
  • Mechanical Design and Layout of New Equipment and Piping
  • Construction Specifications - Mechanical and Electrical
  • Instrument and Equipment Specifications
  • Hydronic Modeling of the System
  • Development of the Control Loop Diagrams
  • System P&IDs
  • Construction Period Support

©2008 Griffin Engineering & Technical Services, Inc. All Rights Reserved.